With all of the work being done on the house lately things have been rather complicated. So far, nothing has been as simple as it should be. Everything on our project list has had a few subsections added to it with the floors and the exterior doors being prime examples of this ongoing process. However, in the end, many of these things, all of these complications, are going to give us what we have been picturing in our minds as our ideal home. Further, many of the things that have been uncovered and a couple of the future projects have and will remove some of the complicated aspects of our home.

The best examples of this are the HVAC overhaul currently underway and the electrical overhaul that we have on the schedule. The old oil and electric system required a heck of a lot of copper pipe running across the basement and up the walls to supply the baseboard heating. The air conditioning, being an afterthought of the original homeowners, was something that was put in as inexpensively as possible leaving us with duct work running through bedroom closets and really not being very efficient. The boiler, oil tank, and all of the copper pipes are now gone, the duct work has been overhauled, and we have now simplified the two zone (the heating was originally on four zones) system running forced air for both heating and cooling.

This project is nearing completion but the electrical work has yet to be started. While a few steps have been taken to simplify this (i.e. old whole house fan has been removed) there is still a lot of work to be done with new matching fixtures being installed and a lot, and I mean a lot, of outlets and switches that are going to be removed (with a few simply being moved). This will eliminate the need for a lot of the wiring that is running throughout the house and will put things (or leave things) in place that actually make sense (i.e. I don’t need three separate switches for the kitchen lights).

It is definitely a process but, as I said before, it will simplify some of the basic aspects of our house. After all, I don’t like having excess pipes and wires running through the walls when they don’t need to be there. After that it should be much easier to maintain. So, we will have to deal with a little more complication before we can reach a point of simplicity. Well, at least until the next round of renovations and projects.

Wednesday, September 7, 2016

Back Behind The Desk


After the rush to get things done last week, it was nice to return to the lodge for the first, post summer, stated meeting. As always, there were a few hiccups leading up to it but the night went by smoothly so I am not really in the position to gripe. And while it was a much more relaxed gathering (as this particular month usually is) we were able to get a number of things done and make progress on a host of other projects.

Of course, with the heat still lingering from the previous month, it wasn’t the most comfortable meeting of the year (especially for those of us in tuxedos) but it was also fairly mild in comparison to previous meetings and past years. What I did notice was the mix of brethren that were in attendance representing a large span of years among the small gathering. Each sharing stories about their summer over dinner and enjoying the fact that their monthly routine is now back offering a respite from the week.

The meeting went by faster than I was expecting and before I knew it the brethren were offering their final thoughts and thanks. At this point I couldn’t help but take a little jab at one of the brethren by recognizing him for completing the requirements for the Master Craftsman Award. This is especially impressive given the fact that he has been a mason for less than two years, received his Master Builder Award in the fall, and began his journey through the chairs in December. Of course, there are also other accomplishments in this short period of time but I have already done enough to embarrass him.

This is one of the more enjoyable moments as there are a few of us that will go back and forth trying to embarrass the other but in a good way. We don’t make mention of faults or errors but rather accentuate and inflate the accomplishments and accolades. It may seem like an odd contest to some but it is an enjoyable monthly banter and, clearly, an ongoing inside joke.

By the time we shut off the lights and began walking to our cars, I was already running through the list of things that needed to get done over the next week and the other items that needed to be checked off the list by next meeting. At the same time, I was really enjoying the simple fact that we were back and that I will have the pleasure of sharing another Thursday night with the brethren next month. And it is that feeling of comfort and anticipation that brings all of us back and keeps us active in the lodge. It is also what brings many of us back to the lodge between meetings for fellowship. It is a feeling that all brothers should have every month.

Monday, August 29, 2016

Mortgage Monday: HVAC Overhaul


Well, we are halfway there. While the work weeks were once filled with ongoing renovations, now the weekends are taking the brunt of the workload. Thankfully, as of this past weekend, half of the HVAC overhaul has been completed with the first floor now able to better maintain the temperature that we set on the thermostat. The old unit is still running (surprisingly) but is now only trying to cool the second floor. Now we only have to hope that it lasts until the rest of the work is done.

In total, the boiler and oil tank have been removed, half of the baseboard units have been pulled out, and the propane tank, hot water heater, and complete AC system on the first floor have been installed. It is already a lot of work and we are only at the midpoint of this renovation phase. While it is difficult to go from the work week to the house work on the weekends, we are already enjoying the benefits of what has been completed.

It really is surprising how much of a different some of these things can make regarding the simple enjoyment of our home. And, lately, with how up and down the weather has been it is nice to have some regularity regarding the internal temperature of the house. We knew that the old system was undersized and ineffective but we didn’t really full grasp how bad it was until we got the new system up and running.

The next steps will involve attacking the second floor and completely taking the old unit offline. The weather actually looks like it is going to cooperate this coming weekend but, of course, our schedule is not so forgiving and we will be out of town for much of the long weekend. Thankfully, we have someone whom we can trust doing this work and we also know the quality of work that is being done which will allow us to not have to think about the house while we are away… more on the trip over the weekend.

For now, we are going to enjoy all the upgrades and improvements that we have decided to have done to the house and we are going to brace for the next part of the process which will descend upon us next month. While there should be little overlap between this current project and the next, there is likely to be a short period of time when there will be work going on seven days a week. Thankfully, it two completely different parts of the house. Should be fun!

Saturday, August 27, 2016

A Welcomed Weekend


While we have a busy schedule this weekend we still have an opportunity to catch up on a few things. When we originally moved into our house we were able to get a pretty good handle on a few things but there have been a few places around our house that have been in need of our attention. The largest and most time consuming of which has been the organization and reorganization of our offices… they always seem to be the first things that are pushed down the list when something comes up.

Things have been so busy this summer that there hasn’t been much time on the weekends to spend as a family let alone get the things we want to get done around the house. While we don’t have the large blocks of time, I can see a few opportunities to tackle some of the disorganization that can be found around us. Now that things have been moved out of my wife’s office from the chaos of renovations last month and there is an extra bookcase in my office, there is an outside chance that we will be able to make some progress.

But even if that time evaporates and we find ourselves in the same situation come Monday morning, I am okay with that so long as we are able to spend the little free time that we have with our son. It is a new give and take that we continue to embrace, and sometimes fight, every weekend. There are moments when we wish we could have some space, have a break, just a little time to ourselves but there are also the moments when we could spend all day just watching our son in amazement occasionally looking at one another in disbelief that he is our little boy.

Just that simple fact makes me forget about all the things that need to be done. But we still need to make the time to take care of the house because when we aren’t overcome by the adorableness, we keep thinking about that list that does seem to want to go away. This weekend we hope to make those down moments a little easier and our list a little shorter. After all, like many things you just can’t put them off forever. Eventually that list needs to be taken care of so when we do have those moments to ourselves, we can enjoy the quiet and relaxation that those moments provide.

Monday, August 22, 2016

Mortgage Monday: Timing


It seems like a constant dilemma that we are facing week after week, project after project. The simple, yet complicated, question that continues to arise is whether we push some of the renovations back into the spring or just get them done now? As I have disclosed previously, it is a really long list of things that we are planning on having done at the house and the constant routine that we find ourselves in is less than ideal. I guess a better question is how much more of this can we handle?

While a postponement would bring us some quiet time heading into the fall and some greater flexibility in our schedule, it would also leave us with a few things that while not essential, are either an eye sore or simply aren’t conducive to us fully enjoying our home. It would also leave a few things ‘half done’ at this point which is less than an ideal situation we would find ourselves living in. But it would be quiet and that is something that can’t easily be overlooked.

However, there are a few larger projects that simply make sense to get done now. We already started the transformation so why would we stop in the middle right now and keep us from seeing our plans for our home from coming to fruition. Yes, it will be noisy, inconvenient (most likely less so than the first round), and put a decent dent in our bank account but we would have nearly everything done. And with these things off the list we wouldn’t spend the cold months cooped up in the house staring at the things that we wish we had changed.

It is a matter of deciding whether we want to relax a little now or relax and breathe easier later? Do we want the inconvenience now or later? And, most importantly, how soon do we want to complete the transformation from our house to our home? This doesn’t mean that we have to check everything off of our list but knocking out a good portion of it would go a long way and allow us to push back a few of the other, “less important”, projects.

Either way, it is safe to say that we are all looking forward to the day when we can consider everything done. And while I can’t wait for that time to come, I am also a realist and know that there will probably be an entirely new list that has been drafted in the interim and I am not completely sure if this is a good thing or a bad thing at this point. What I am enjoying is the fact that no matter when we do all of these things, we will be improving our home and we will be able to enjoy them for many years. So, here is to the future!

Monday, August 15, 2016

Mortgage Monday: Not Recommended

There used to be plants there...
One of the many projects that we have checked off our list so far this summer has been to get some basic landscaping done. Nothing complicated or expensive. Basically, all we needed to do was to remove the plants around the house, side and back, and replace with grass or some means of drainage. Again, simple is better and what we really wanted to accomplish was to minimize maintenance while avoiding future potential problems.

After going through the usual process and receiving a few quotes, some in writing and some over the phone, I decided to hire a local landscaper who came well recommended. Everything was falling into place and we agreed upon the work that needed to be done. The whole process was going smoothly… at least until they showed up and actually started working.

Well, it was bound to happen. Our luck has been too good with contractors, service companies, sales people, and other transactions lately. Someone was bound to foul up at some point and last week we had a “winner”.

I took the time in the early morning to give a final review of the tasks that needed to be accomplished for the day… this was a one day project. When I left for work that morning I felt pretty good about what I would find when I came home that evening. After multiple phone calls throughout the day and seeing what still needed to be done when I pulled into the driveway that night, that level of comfort had completely disappeared... the work was going to take an extra day and the work that had been completed was not of the quality that we were expecting (I'm not sure that they are familiar with the concept of parallel lines). 

In reviewing the footage from our security system, speaking with my wife, and watching a little as they got started the next morning it was clear that this was nothing more than a paycheck for them. Now I completely understand that they need to make a living but that doesn’t mean that short cuts should be taken or they should provide substandard work simply so they could get to the next job that much faster. It was actually to the point that I had them remove some work and change things up on the second morning as I had little confidence in what they would end up producing.

Thankfully, we have a contractor that we trust and that will fix the errors left behind. But it is safe to say that we will not be hiring this company again for some of the future projects that we will be having done in the yard. At this point I’m just glad that I hired someone else to take down the trees around the property because these guys, based on the work that I did have them do, might have taken out the house, or at least the shed or gazebo, in the process. At the very least, I know they wouldn’t have done the excellent job that Monster Tree Service did a couple of weeks ago (I highly recommend this company). I think I will stick with the people I trust for now.

Wednesday, August 3, 2016

Final Month Of Preparations


It is always surprising how quickly the summer goes by and how short the respite is from many of the lodge duties that occupy the rest of the year. With less than a month to go before resuming our meetings, there is still a lot of work that needs to be done so that we can have a strong finish to the year. That being said, while the summer is usually a time for me to take a step back and relax for a few moments, I haven’t had the time to do so which makes this final month all that much more difficult.

This is the reality of the balance that we all must strive to achieve between our work, personal, and fraternal lives. While there is one part of me that wants to try and avoid some of the lodge duties for now while I try to catch up on personal and work matters, there is also a side of me that is looking forward to each and every activity, request, and email as they, for some odd reason, tend to balance out the chaos in other areas of life.

That is what we must remember and what many of us forget about the role that freemasonry plays in many of our lives. It is not just a means for fellowship and education, it is a way to bring structure, routine, and ritual to the hectic times in life. It is the regularity and measurements that it brings to our days that can sometimes be the most important role that our fraternity plays in our lives. And sometimes a part of that routine and regularity is the work that is required of officers.

With so much happening in my life right now there is an odd solace in the tasks that are asked of me as Secretary. I know what needs to be done and what projects, events, and meetings lie ahead. But I also know that there are going to be things that will come up now and again that I don’t expect. To believe otherwise would be a fallacy. I guess you could say that is what makes this routine unique and prevents monotony from setting in. So it is with this final month of the season that we prepare for the fall, enjoy the fellowship of our brothers, and return to the foundation of our work.

Monday, August 1, 2016

Mortgage Monday: We Finally Have Our House Back!

This is how it all started.
When I first reached out to contractors in late June there were two very simple projects in mind, garage doors and an office door. That is all that we planned on doing this time around and all that we thought our budget would permit. The garage door situation was resolved rather quickly and Shank Door did not disappoint in either price or service. However, it was a much more involved process trying to find a contractor for the work inside the house. After all, this is our home and I wanted to make sure that whomever we chose would do the job right.

I first met with a few contractors and was less than impressed with how they were approaching this rather simple project. It wasn’t looking good until I met with Mike Swenson from Swenson Home Solutions. Not only did he listen to what I wanted done but he was also honest with me and let me know what would work best for the space where I wanted my office door. On top of that his estimate was lower than all the others that I received by a few hundred dollars. There really wasn’t a question at that point, this was the right company for the job.

First addition to the project list...
This is when that small project began to morph into something much bigger. What started as a simple French door installation soon transformed into a small first floor renovation. With the prices we were being given, the work that we wanted done was, all of the sudden, possible now rather than later. This is when we decided to replace the carpet and linoleum with hard wood floors (thanks in part to a great price on ¾ inch oak floor from Carpet and Tile Mart in Reading), replace all of the external doors, replace both of the toilets on the first floor, and remove the baseboard heating. The two day project was now expected to take a week and a half.

...and the biggest addition to the project list
(we will work on the walls later).
Well, that was the plan. The office door, besides the floor being slightly out of level, went smoothly but everything else began piling on days to the project. Not only were the carpet and linoleum subfloors different thicknesses but the kitchen floor had a thick layer of leveling compound under it which required over a week of work on hands and knees with a heat gun and scraper. It made the dry rot repairs around all the doors seem like a minor hiccup that only cost us a couple of days. In the end, the week and a half projection ended up being nearly four weeks of work. However, when it came to the bill, what surprised me most was the fact that he stuck to the original estimate and only added a nominal amount for supplies.

We finally got our home back today and we are really happy and impressed with the work that has been done. It was a lot of work and only the first stage of what will be a rather long process to make this home our own but at least we now have an honest contractor that really has our best interests in mind and treats each house as if it were his own home. What more can you really ask from a contractor? Not surprisingly, we are already having him write up a few more estimates for some other projects in the works. But, for now, we are going to enjoy our “new” home.

Monday, July 18, 2016

Mortgage Monday: Water, Garage Doors, And Security


Last week I spent some time working from home but, just like the days that I decide to “take off”, it was for the simple reason that there was work that needed to be done at the house. Actually, I wasn’t doing any of the work, I was there so that could answer any questions that may come about from the minor projects around the house. Namely, over the two days at the end of the week we had Martin complete an inspection of our filtration system, Shank install the garage doors, and ADT check a few of the sensors that we have had to adjust lately.

Surprisingly, all of these appointments went about as smooth as possible beginning with the garage doors on Thursday. The old doors were exactly that and with the one destroying itself a few months ago, it was something that needed to be done this summer. Now seeing the new doors in place, the features that Shank includes, and hearing how quiet the new motors are, we are really glad that we made room in the budget to get this done. Of course, it helps that the person installing them really knew what they were doing and had the full swap out (doors, motors, tracks, sensors, etc.) done faster than I was expecting.

Friday morning the door bell chimed at about a quarter to eight in the morning. While I am all for being on time or even early to appointments, it isn’t as pleasant when ADT has already screwed up the scheduling (I made the appointment for and confirmed it with customer service at the time for the 12-5 window). This on top of the fact that the technician expects our full attention as we are in the middle of our son’s morning routine. Just one of many issued that we have had with that company so far. After a few unexpected (and without warning) triggers of the alarm and a few moments of puzzled contemplation regarding the use of adhesive, the work was completed and the rest of the morning could begin.

Martin Water was the third and final appointment of the week and as they were the ones who maintained this system previously, it was a pretty straightforward process. And it was great that they took the time to go through the steps that I need to follow to properly maintain the system. I was shown once before when we bought the house exactly what needed to be done but I can’t say that a whole lot of information was retained that chaotic week.

So, it may not be a big dent in our overall plans for the week but we were able to at least get things started while making sure a couple of the other things in the house don’t become future projects. And while ADT may be lacking at times the important thing is that the security system and monitoring are still solid. As for Shank Doors and Martin Water, don’t hesitate for a second if you are in need of their services… their prices and the quality of their work is exceptional. That is all… for now.

Monday, July 11, 2016

Mortgage Monday: Revising The Project List


My wife and I have continuously kept an informal project list of things that we would like to have done at the house. As I have written about before, some things are more pressing than others with the majority of these tasks being things that we want to do rather than things that need to be done. However, in the end, they are all projects that will transform this already wonderful home into a perfect one.  

Of course, we have to work within our budget so some things have been shifted around according to our finances. This has also impacted the overall timeline of the work we would like to get done at the house. That being said, as we have priced out some of the items on our list there have also been things shifted up or down accordingly. Lately, those prices that we have seen have allowed us to move things up in our timeline.

To review, here are the things that we have known for some time and which we had planned to address over the next few years:
  • Installing office door
  • Flooring (hardwood or laminate?)
  • Minor electrical work (fixing existing issues)
  • HVAC overhaul
    • Replacing boiler with hot water tank
    • Installing steel duct work
    • Installing two HVAC units
    • Installing underground tank for gas
  • Side Deck
  • Front Porch
  • Repair / replace retaining wall
  • Tree removal
  • Installing chimney cap
  • Repointing masonry
  • Garage Door replacement
  • Re-grading around the house

That was the basic list that we came up with shortly after we moved in and it remained relatively unchanged for a few months. Over time, we added a few more items:
Interior painting
  • Replacing kitchen and bathroom hardware
  • Replacing appliances starting with the washer and dryer
  • Converting fireplace to gas
  • Expanding bonus room upstairs and finishing

Now, the list has grown to include a few new items and some clarifications on the aforementioned ones as well. With the existing things that we knew from the beginning, previous additions, and a batch of new items, this new roster of projects now consists of the following:
  • Installing French doors to my office
  • Installing hardwood floors throughout
  • Minor electrical work (fixing existing issues)
  • HVAC overhaul
    • Replacing boiler with hot water tank
    • Installing steel duct work
    • Installing two HVAC units
    • Installing underground tank for gas
  • Converting fireplace to gas
  • Install gas or solar generator
  • Installing composite side deck and front porch
  • Repair / replace retaining wall
  • Tree removal around property
  • Installing chimney cap
  • Re-pointing the patio
  • Garage Door replacement
  • Re-grading around the house
  • Interior painting
  • Replacing kitchen and bathroom hardware
  • Replacing appliances starting with the washer and dryer
  • Redirecting dryer vent
  • Replacing refrigerator
  • Expanding bonus room upstairs and finishing
  • Replacing front, side, and patio doors
  • Lighting fixtures in all bedrooms
  • Replacing toilets
  • Resealing basement walls
  • Re-configuring landscaping (removal of flower beds)
  • Replacing / adding outdoor lighting
  • Replacing doors to garage with fire rated doors
  • Replacing gutter guards
  • Replacing blinds
  • Installing new window treatments
  • Replacing windows

What started as a relatively small collection of projects has grown rapidly into a long list of things that we would like to have done to the house. And while there are many more project than before, we are still hoping to get the majority of these things completed by the end of next summer. Some things will be quick while others will take weeks and some are things that we will get done eventually like replacing the windows. So, beginning this summer, things are going to be quite busy around the house but, slowly and while sticking to a specific budget, we will transform our home into one that we have only dreamed about in the past.   

Monday, June 27, 2016

Mortgage Monday: More Babyproofing


When my wife and I were looking for a house it was always in the back of our mind the steps that we would have to take with each property both right away and in the near future to make sure it was a safe environment for our son. Some places were better than others and while the home we eventually purchased wasn’t exactly what we had in mind, we knew that it had everything we wanted and we could baby proof everything with relative ease. When we first moved into our home we, once again, took stock of what needed to be done but, since our son wasn’t mobile at the time, nothing was pressing.  

A few months later and the trips to Lowe’s, Walmart, and other stores became more frequent. When he first started crawling we made sure to take care of the babyproofing basics around the house. This consisted of making sure that the outlets had covers, baby gates were installed, and a foam buffer was secured around the hearth. At this point, we were pretty much ahead of the game in most regards. However, we quickly fell a little behind.

Before I knew it, I was putting up additional gates, including some handyman work to install the one at the top of the stairs, putting covers on door knobs, and constantly surveying the house for the odds and ends that could cause a problem. After a long weekend, we were once again where we needed to be but that didn’t last very long either. With our son’s first few steps that pesky list reappeared and quickly began growing until finally we couldn’t put it off any longer.

This time around things were a little more involved as we installed locks on the kitchen cabinets, secured furniture to walls, and rearranges some of the other items throughout the house so that it would remain out of reach of our son’s tiny curious fingers. This was also about the time that we had to readjust our car seats and install additional doorknob covers. Again, we got caught up rather quickly but find ourselves with a list that refuses to go away.

Each time we have to add or install things here and there we think back to some of the houses that we looked at during our search. Every time we are relieved that we made the decision that we did and purchased the house which we now call our home. It just goes to show that even if a house seems perfect and could have immaculate staging, you still have to think about your needs and how well that space works for you now and, more importantly, in the future.

Saturday, June 25, 2016

What Happened To Our Summer?


Previously I wrote about trying to figure out where my wife and I were going to take our son this summer. Many of the plans mentioned in that post have been solidified but it still only reveals one small aspect of our summer scheduling. I wish it were that simple but that is simply not the reality in which we live. There are many other factors playing into the rearranging of days, times, projects, vacations, and obligations that many of us have to juggle during this time of the year.

In addition to our desire to escape for a day or two at a time we also have many other things scribbled into the small grids that summarize our season. The next group that we have to account for are the various projects that we are having completed at the house over the next couple of months. These include the small items like garage doors, landscaping (i.e. tree removal), and interior door installation. And then there are the not so small projects that I hope to see completed like the HVAC overhaul as well as deck and porch construction. All of these take a lot of time and, right now are a bit in flux with regard to timing which is why we need to keep a few spots open.

Next are the family events that round out the calendar and that have been scheduled for months. This doesn’t just include the picnics in August but also the times when we need to schedule times to get together with family. There are so many things happening at this moment that it has become necessary to schedule these weekends. Of course, there are also a few times, granted they are few and far between, that we have scheduled to meet up with friends as well.

Day trips and local events have also become important in our schedule as we want to take the time to explore the communities around our home and also find different places for us to visit on a regular basis. Finally, there are the obligations that we have both during the week and on the weekends that we have little flexibility in scheduling. Did I mention that we need to maintain our home and property too… yeah, that requires allocation of a few weekends. So, at this point, it is surprising to find that there really isn’t a great deal of free space remaining on the calendar and the few open weekends that do exist are going to be welcomed as a respite from the chaos of the season. That is, of course, if they don’t get filled up with some unavoidable occurrence between now and then.

Monday, June 20, 2016

Mortgage Monday: The Small Things

Orkin may have gone overboard... 
Summer is now upon us and my wife and I have been busy picking up things here and there for the house and for the yard. So far the tractor has been running well and the other gas powered tools have been taking care of the rest of the property. Now it is time, at least for the outside items, to round out the things that we need to maintain our little piece of land. This includes all of the trimming items as well a ladder, saw, sledgehammer, and axe. You would be surprised by how useful the last two items are around the property.

Many of the other items that we have picked up or ordered lately have been more about the comfort and convenience around the house. Having a hammock in the back yard is not something that we need but with the deal that I found at one of my usual online stores it was well worth the nominal cost. Plus it completes the collection that we now have on the patio which includes a dining set and a couple of Adirondack chairs. Not something that we will use every day but relaxing when we get the chance.

In the house there have been a few upgrades lately including a new crock pot and coffee maker (nearly free when we combined the clearance price with an old gift card at Macy’s). Also added in the mix was a new microwave that fills the space that was designed into the kitchen layout. Our last one was struggling a bit and, again, a good sale price was found. Beyond those few things, everything else was pretty much purchased for our son as he is growing out of many of the products that we have been using for months (i.e. new sippy cups and utensils).

And with the first days of summer now heating up the landscape, we are also better protected now that we have had Orkin come out and do some preventative work and some mole remediation. While we haven’t had any insect problems beyond the few stragglers here and there, I would rather have the reassurance that it will not be an issue in the future especially with our son scurrying all over the house. Now, all the bugs and spiders know that this is not some place that they want to try and get into and the moles are digging their way away from the property (they were actually a real problem in the front and back yards).

So, let the summer begin. We have the tools and we have taken care of many of the things that we needed to in order to prepared for the weather. Now all that is left is to get all of the small projects completed followed by some larger tasks and we will be ready for years to come. That being the payoff, it is well worth making the investment now.

Thursday, June 16, 2016

Busy Day Off


A day off is never simply a day off anymore. While there are occasions when I have taken some time to travel or go to different events, lately that hasn’t been the case as there are simply too many things that need to get done or appointments that need to be scheduled. Yesterday was a prime example of this new, self-created, reality as I originally took the day off to speak at an event in the afternoon and go to my son’s appointment in the early evening. Well, that isn’t exactly how things ended up working out.

Having slept in an extra thirty minutes on Sunday, I told my wife that I would take care of breakfast for our son in the morning. It is actually pretty fun spending the time with him and he is usually pretty patient with me when it takes a little longer to prepare his meal. By the time he was done eating and I had finished waking up, half of the morning was already gone and the first appointment of the day was about to begin. When I previously said that I needed to get more estimates done for the various projects around the house I wasn’t kidding.

As I discussed all the options and what exactly needed to be done with the garage door company, my wife headed out to a local event as one of the orchards in the area with our son. After my meeting was done and the quote in hand, I got in the car and drove the ten minutes down the road to meet up with them. It was actually pretty interesting watching my son walk along the long rows of strawberries eating all of the fruit out of the small basket almost as soon as my wife put it in there. When we finished picking our pile (pile and a half when accounting for all the ones our son consumed), we got back in our cars and headed home where we finished feeding out son his lunch, played a bit, and put him down for his nap.

Just as we were about to take him upstairs, the doorbell rang and the second appointment of the day began. This time we received a quote for my office doors (and a few ballpark figures for the deck and porch that we would like to add later). Like the first quote of the day, it was much lower than the initial estimates that I received. Unfortunately, that was the end of the estimates as the third appointment had to be rescheduled for next week… honestly, I don’t know if they are going to be able to beat the price I just got from this company but we will have to wait and see.

After taking a short break when I was able to check the mail, send a few emails, and waking up our son for his snack, we got back in the car and headed north to the pediatrician’s office. It was a great checkup that I will write about later and, fortunately, the waiting room wasn’t filled with Gosselins. Like many days away from the office, time seemed to evaporate from by grasp and before we had another moment to catch our breath, the day was winding down and we were planning for the follow day. All of this and I still wasn't able to fit everything into my schedule. And, at the moment, it looks like my next day out of the office will be just as busy next week.

Saturday, June 4, 2016

From Boy To Man To Mason


June meetings are always interesting as you never know what the turnout will be like and what motions will be made before the summer break. It is also a time when I have to make sure that everything is up to date so that nothing gets delayed until September. However, the last meeting before the summer break this year was a little bit different and a welcomed change from the previous years. Attendance was average, motions were minimal, and I was able to get everything off of my desk. But that wasn’t the best part of the night.

While we previously held this large gathering a bit earlier in the year, this time around the last meeting before the summer vacation was Scout Night. Not only is it a great opportunity to see the lodge room filled with so many people (masons, parents, and scouts of all ages) but the engagement between many of the people in attendance is great to see. Contract to what many people think, there is a tremendous masonic influence on the foundation of scouting in the United States and bringing all of us together is a tremendous opportunity to share a little bit about each of our respective organizations.

Further, there are a lot of masons (many of which are serving as officers) who were members of the scouts when growing up. Correction, there are many masons who are scouts as it is something that never leaves them. Of those brothers, quite a few have continued their involvement with scouting while adults whether through guiding their own sons or serving as a mentor for a pack or troop. It was particularly interesting to hear a few of those brothers explain what scouting meant to them growing up and how freemasonry has served to continue those principles and comradery that shaped their lives early on.

By the time the evening came to an end, there was a great atmosphere that was magnified by the evening and the conversations which stemmed from the presentations were fascinating to hear. And with a clean slate for the summer, I was eager to join those remaining in the lodge and enjoy the tremendous success that we have all experienced thus far in the first half of the year. While by no means perfect, I hope that the many achievements that we have fostered over the last several months continue to be a part of our new routine rather than simply a small fortunate period of success.

The program served as a great way to enter into the sweltering months and it should carry over into the fall as we look to complete another fantastically smooth year. And with all of the required tasks completed before the weather turns, we are in a great position to initiate some other projects that have been lagging behind for some time now. The lodge may be dark for two months but the light within remains bright and continues to grow brighter with every passing week.

Wednesday, June 1, 2016

Fortunately And Unfortunately


Heading to the lodge this week I had a clear cut set of objectives that I needed to address with a number of the brothers who would be in attendance. There have been a few item that have come up over the last week that needed to be worked on immediately and a number of scheduling matters that had to be taken care of so nothing was overlooked heading into the summer. With these projects in place and the responsibilities coordinated, it would afford me the time to take care of a few other tasks so that we could have a clean slate after the stated meeting.

After sitting in an inordinate amount of traffic on my way down and saying goodnight to my son over the phone, I arrived at the lodge with a number of brothers already gathered around one of the dining tables taking care of business. Certainly a welcomed sight knowing all that needed to get done. While I did arrive a touch later than usual, by the time I set my bag down the necessary conversations had already begun. As soon as I sat at the table, I pulled out my laptop and we got to work.

Fortunately and unfortunately, some of the recent difficulties that we have faced earlier in the year have actually put us in a great position to fulfill some of the recent requests made of us by Grand Lodge. This is also why the work that we accomplished last night was quick and highly efficient. There are a few things that still need to be collected but we will certainly be able to submit all the necessary paperwork well before the 45 day deadline. It was actually rather surprised as well as appreciative and impressed by the organization demonstrated by the Trustees of the lodge. Everything was ready to go and transferred to me within minutes.

I had expected this first meeting to be much more drawn out than it was so all the other tasks for the night were handled in a much more casual and also thorough manner allowing me to check and double check regarding a variety of ongoing and new projects. By the time we locked the doors and headed back out to the parking lot I was feeling good about the upcoming meeting and looking forward to the long break over the summer. Hopefully, meetings like the ones I had tonight become more of the norm rather than the exception to the rule which has been the case in previous years.

Friday, May 13, 2016

Firearms Friday: Open Projects


There are a number of projects that are on the table which, as I stated before, I hope to complete over the next couple of months. Knowing that I will finally be able to get some work done at my bench it is time to pull together the project list. While by no means complete, this at least gives me a starting point and a way to track my progress on these initial projects. Hopefully this will also keep me from getting distracted by the other parts and pieces that are tucked away in my work space.

The first set of items that need to be taken care of are the AR15 builds. While there are a few personal projects that I would like to complete and others which I hope to modify, there are rifles that are still in pieces and that, once assembled, I hope to sell to one of the local gun shops… a few extra dollars in the bank account would be nice. However, there are a number of trigger installations and optics that need to be mounted that I have been putting off as well as a few pistol builds that keep getting pushed to the side so I hope to finally get those done. This will clearly be the bulk of the work and also clear the most space on my bench.

The next project is to swap out a number of the parts on my Smith & Wesson M&P9 Pro CORE. Already a fine firearm out of the box, there are a few easy modifications that can be done to customize the pistol. Those adjustments include an extended magazine release, replacing the magazine base plates, and installing a red dot. Nothing outrageous, just some solid upgrades. Of course, I may just start with my Glock 17 which is in need of an upgraded magazine release, slide stop, and replacement base plates. So, I guess you could really combine these two to almost being a single project on the list.  

The third thing on the list is to secure a few of the safes that need to be installed around the house, testing, and adding bit of concealment. Everything else comes down to maintenance, organization, and culling through the inventory to see if there are any items that just aren’t getting used and would be better served if I were to sell them and let someone else enjoy the craftsmanship. Hopefully by the end of the summer I will have a better handle on the work space and everything moving forward will consist primarily of maintaining and enjoying what I have in my safe. At least that is the goal.

Saturday, May 7, 2016

Fun (And Food) For The Whole Family


There was a little bit of chaos for me leading up to the stated meeting as there usually is before an official district visitation. The usual list of items that need to be prepared before any meeting pretty much doubles in size and given that our lodge is on display to a lot of visitors I make sure to double check that everything is in place hoping that the one thing that I do forget can be overcome with relative ease. And this is something important for every officer to remember… you are going to forget things. The trick is to make sure that it is as insignificant as possible as to not disrupt the meeting itself.

The visitation this year was a little different than in previous years. For one, I was able to enjoy some time in the hall dining with the brethren and, in some instances, with their wives. That was a pretty significant change and one that I hope to see continued in the months and years to come. Not only were wives and families welcomed to join us, we were also treated to a delectable Brazilian dinner prepared by one of the wives (with a little assistance from her husband and Junior Warden). For me, on the top of that to do list was to make sure I thanked her for all of her hard work… something that I am glad that I remembered to do.

The meeting itself went very smoothly with only a minor mistake on my part that was easily rectified. It was also a very productive meeting as there were a number of projects that needed to be addressed and motions that needed to be made. Overall, especially given the last couple of months, it was a welcome respite from the week and a reinvigorating one at that. There is great progress that has been made, positive changes that are in the works, and important motions that have been passed.

When the meeting was over and all the bills were paid, I finally sat back to collect my thoughts for a few seconds before starting another conversation. In many ways, I can’t believe that this is already my third year as Secretary and the beginning of my forth year as a mason. It seems as though I was raised yesterday while, at the same time, I have been coming to lodge my whole life. It is really hard to put into words but something that motivates me to see the lodge succeed and to see new masons to succeed as well. And now, with the changes in process, it is something that I will be able to happily share with my family on a more regular basis… especially my son who I hope will join me at a meeting someday.  

Friday, April 29, 2016

Firearms Friday: Finally Getting Organized

Now that's a work bench!
It has only taken five months but I am finally getting around to organizing my work space. Within the first couple of weeks after we moved in, I did take the time to get all the boxes downstairs, unpacked a few, and stacked the rest neatly in the corner for when I had some more time to dedicate to the endeavor. With the exception of adding a few boxes and retrieving a few items, this is pretty much as far as I got with regard to organizing my work space.

The reason for this lack of progress is simple. It was quite the adjustment during the first few months in our new home and during that period of time there were other projects that took precedence over my designated basement work space. When there was some free time on the horizon a couple of months ago, once again, there were other matters that needed to be taken care of before I could spend the time needed below ground.

Now that a few things have seemingly slowed down and I am finally getting caught up on the various projects and responsibilities that have been hanging over me over the past couple of months, the time has come to set aside the time to get things organized. Of course there is also the motivation (mentioned last week) to complete a few projects and pull together a number of items to be sold. Sometimes you just have those moments when you need to cull the heard and with the unexpected expenses that my wife and I have incurred lately, a little extra cash would be welcomed.

It will also be nice to take stock of the parts that I have. While I have a spreadsheet to track much of the material huddled in the corner of the basement, I am certain that there are a few things that may have slipped through and I would like to know exactly what I have before I resume building. After all, you never know... I might be able to take a few of my personal projects up a few notches. However, the most important thing is that I will be able to have the space organized so that, in the future, I can take care of a few things when I have ten minutes here or there rather than waiting, as I have been, until I have a day to get things done. That would be nice.

Friday, April 22, 2016

Firearms Friday: Selling More?

Well, that's a decent goal. 
There have been so many unexpected expenses that my wife and I have incurred over the past couple of months and many more that we are anticipating over the next months that the time has come for me to start culling some of the firearms from the safe. I hate having to do this again but it is sometimes what needs to be done. Besides there isn’t anything that I own that isn’t replaceable and the benefits are at the point when they significantly outweigh the desire to hang on to what I have. And that is what I have to remind myself of during this process… I’m not getting rid of everything and what I do sell I can find again in the future.

Of course, now is the difficult part of making the decision of what stay and what has to go. This also may require an investment of my time in completing a few basic builds to flip. On the positive side of things this will force me to finally get my work space organized and free up some of the clutter that has continued to plague me. This also means that I have to find the time somewhere in my schedule to head over to the local (actually not so local) gun shop in order to hopefully add some much needed funds to our account.

At the same time, I hope that this process pushes me to finally complete the other projects that I plan on keeping. They have been on the shelf (in the safe actually) for far too long and I am missing the cathartic benefits of working with my hands to actually build something. There are also a few parts that have to be installed and some customizations that have to be made… maybe there will be time to get these done once I get back into the rhythm of building. And, having cleared some extra space, there will undoubtedly be some extra room to store all of these new creations.

This is what I have to keep telling myself as I am definitely not the only one that dislikes having to sell off on item without immediately replacing it with another. That being said, this is a common ebb and flow of the sport and I am certain that I am not the only one that keeps going through this annoying cycle. But, again, we do this for our family as there are more ways than one with which we can protect them.