Showing posts with label floors. Show all posts
Showing posts with label floors. Show all posts

Tuesday, August 23, 2016

TMI Tuesday: I Don’t Like Working Being Done!

Might have to make one of these given how fascinated he is with the work being done.

Over the last couple of months we have had something going on at the house. From the big projects like the doors, floors, and garage to basic maintenance and inspections to our current air conditioning marathon, there has been a regular flow of people in and out the door. While our son does enjoy watching the work being done and seeing new people every now and again, there are definitely moments when he has simply had enough. And he has no qualms about letting us know when he is done with all the work.

Thankfully, now that the floors are done on the first floor, we are past what we consider the most inconvenient and intrusive part of the renovation process. However, we currently find ourselves in a position where we are having the air conditioning being overhauled on the weekends and while it doesn’t really impact the living area upstairs, it does take me away from my son for a little bit during those precious days away from the office. It really is a give and take at this point but these are things that will pay huge dividends in a myriad of ways in the future.

He does enjoy the opportunity to spend time with family and playing with his cousins. They have been able to keep his mind off of the banging and drilling for the most part and have, in general, kept him occupied during what could be a difficult time of the week. That doesn’t change the fact that he really doesn’t like work being done at the house and there are moments when he stops and clearly babbles his displeasure at the situation.

It makes us wonder how he is going to react to the additional projects that we have planned for the future and whether or not there is enough of a break scheduled in between the phases. Of course, that window could be much smaller should a few things get delayed further but I am trying not to think about that… our luck has to change in that regard, right? I am certain that there will be some sort of voiced frustration but I am not sure to what degree. We will, like many other things, have to wait and see how things play out.

However, with all that being said, our son does seem to like the changes and gives us this look every now and again like “now I see what you were doing, this was definitely worth it”. And it does help that he is able to sleep through a lot of noise and overall commotion. So it may prove to be beneficial when we finally return to what could be considered a “normal” routine. Whenever that is.

Tuesday, August 2, 2016

TMI Tuesday: I Want My Playroom Back!


When we first started this round of renovations we tried to hold off on disturbing our son’s playroom for as long as possible. As work progressed that was no longer a possibility and our son was not happy about it. Obviously, as the doors were being worked on, even the door in the playroom, we were able to keep things relatively normal but as the flooring got underway the toy boxes began to vanish and the bookshelves disappeared.

It was tough for a few days as our regular routine was completely out the window as the carpet came up and the subfloor shown throughout the first floor. Thankfully we do have a playroom upstairs but it simply isn’t the same and our son let us know about it. While he was at “camp” during the day, when my wife brought him home he wasn’t quite sure what to make of the chaos that permeated the house. And with everything in disarray we had to further throw him off by making sure that he had his shoes on and carrying him from one spot to the next more than we usually do.

Even meal times we a bit of a challenge as he would stop every once in a while, point to the floor, and let us know that something just wasn’t right. Toward the end, the babbles were more along the lines of “when the heck is this going to be done already?” But, somehow, we managed to make it through the tantrums and the screaming and now our son is getting reacquainted with his playroom… the same as it was before but also a little different.

So far our son really enjoys the new door at the end of his playroom as it is much clearer and brings a lot more light into the room. The carpet is something that he seems to like as the different colors and softer feel are rather interesting at times. The hardwood floors are, by far, the biggest adjustment but he does seem to enjoy running around from room to room with seemingly more confidence than when he was running from one surface to another and back again. But, most of this doesn’t matter as all of his toys and, more importantly, books are back in the room and he can, once again, spend better quality time with mommy and daddy now that the work is done. That being said, the next round of renovations should be interesting.

Monday, August 1, 2016

Mortgage Monday: We Finally Have Our House Back!

This is how it all started.
When I first reached out to contractors in late June there were two very simple projects in mind, garage doors and an office door. That is all that we planned on doing this time around and all that we thought our budget would permit. The garage door situation was resolved rather quickly and Shank Door did not disappoint in either price or service. However, it was a much more involved process trying to find a contractor for the work inside the house. After all, this is our home and I wanted to make sure that whomever we chose would do the job right.

I first met with a few contractors and was less than impressed with how they were approaching this rather simple project. It wasn’t looking good until I met with Mike Swenson from Swenson Home Solutions. Not only did he listen to what I wanted done but he was also honest with me and let me know what would work best for the space where I wanted my office door. On top of that his estimate was lower than all the others that I received by a few hundred dollars. There really wasn’t a question at that point, this was the right company for the job.

First addition to the project list...
This is when that small project began to morph into something much bigger. What started as a simple French door installation soon transformed into a small first floor renovation. With the prices we were being given, the work that we wanted done was, all of the sudden, possible now rather than later. This is when we decided to replace the carpet and linoleum with hard wood floors (thanks in part to a great price on ¾ inch oak floor from Carpet and Tile Mart in Reading), replace all of the external doors, replace both of the toilets on the first floor, and remove the baseboard heating. The two day project was now expected to take a week and a half.

...and the biggest addition to the project list
(we will work on the walls later).
Well, that was the plan. The office door, besides the floor being slightly out of level, went smoothly but everything else began piling on days to the project. Not only were the carpet and linoleum subfloors different thicknesses but the kitchen floor had a thick layer of leveling compound under it which required over a week of work on hands and knees with a heat gun and scraper. It made the dry rot repairs around all the doors seem like a minor hiccup that only cost us a couple of days. In the end, the week and a half projection ended up being nearly four weeks of work. However, when it came to the bill, what surprised me most was the fact that he stuck to the original estimate and only added a nominal amount for supplies.

We finally got our home back today and we are really happy and impressed with the work that has been done. It was a lot of work and only the first stage of what will be a rather long process to make this home our own but at least we now have an honest contractor that really has our best interests in mind and treats each house as if it were his own home. What more can you really ask from a contractor? Not surprisingly, we are already having him write up a few more estimates for some other projects in the works. But, for now, we are going to enjoy our “new” home.

Thursday, August 13, 2015

Wet And Stinky


It is safe to say that we did not have a relaxing start to the week. When my wife and I finally finished sorting and packing all the things that we wanted to store on Sunday night I made a big pile in front of the basement door. I was hoping that I could simply make a few trips up and down the stairs while sliding the boxes onto the shelves. There isn’t much room left but there was enough to accommodate our recent cleaning. This was the quick and easy plan when I first balanced those boxes and bins atop the stairs… sometimes plans just don’t work out.

It all got derailed during my first trip to the unfinished storage room. I opened the door, turned on the light, and squinted a bit as the glint reflected off the wet floor. Something was obviously wrong and I soon found the culprit in a leaking pipe coming out of the HVAC unit. After taking a quick picture and sending it to the maintenance guy for our house, I quickly stacked the shelves before calling to report what I had found. Thankfully, he was up at midnight and quickly got a plan together which had everything taken care of in a couple of days.

Stuff happens and things were taken care of quickly so no complaining on this one (unlike in the past). However, our fun didn’t stop there as when I got home from work on Monday I was welcomed with fumes filling the house and my wife, with a rather pissed look on her face, greeting me at the front door. As it turns out, our neighbor decided to refinish all of his hardwood floors next door and didn’t even think to let us know. By the time I got home they had just finished stripping the floors and the stink was permeating the walls.

While we can’t stop him from improving his property, it would have been nice to have had a heads up. After all, we spend a couple of hours going back and forth and double checking that our son would be okay sleeping in his own bed. This frustration could have easily been avoided.

The following days was met with more stink as the finish was applied. It wasn’t until I left for work this morning when the smell finally somewhat dissipated and the noxious wall finally fell (it still stinks but it isn't as bad as when it started). So hopefully this is the last of the leaks and soon to be the last of the smells for a while but one thing that this reinforced for us is the fact that we are definitely going to look for our own free standing home with a little bit of a buffer of land around us. Thankfully, that was already part of our list.

Tuesday, October 22, 2013

A Pleasant Surprise


I arrived at the lodge tonight a bit early having made great time on my drive from the office. I turned into the lot expecting to have some time to kill as I stood outside and waited for others to arrive (especially those with keys). But tonight was a bit different.

As soon as I got out of the car and popped some smoke I noticed another one of the brothers pull in a few spots down. I couldn’t see who was driving but there are not many Mississippi plates around here. So, I walked up and we caught up a little bit on what was going on (not much since we saw one another last Tuesday and Friday).

Walking up to the front door it was easy to see that there was at least one person who beat us there and when we entered we found that it was a few brothers. After catching up on the happenings of life outside the lodge (most notably some humorous stories about the tribulations of rebuilding at the New Jersey shore) our conversation shifted to the weekly discussion about improvements that need to be made to the building.

There are many items on our to-do list and more things seem to be added every week. However, there is progress being made and we were reminded of that fact when we walked down the stairs on our way to the office. It’s amazing how a simple cleaning and fresh coat of paint (or even primer as was the case tonight) can make such a huge difference just in the experience of coming down the stairs.

Maybe it was the fumes (the floors in part of the basement had just been refinished as well) but I was feeling really good about some of the progress that was being made. Granted they are small improvements at this stage but they are improvements nevertheless. Of course, this only fueled further discussions regarding improvements but at least they were now being focused on the needs that exist in the office space.

This is when my to-do list began to grow. Having a little access to some of the things we need and want in the office, I was writing notes about who I need to call and what I needed to do as we wrapped up a few of the tasks for the night and began our slow departure for the evening (which usually takes at least thirty minutes). While it is additional work, they are things that I gladly take on knowing that I can have an impact on the lodge (however small that may be).

So our night began a little bit early and ended a little bit early. We need these kinds of nights every once in a while to balance out the much longer meetings and, sometimes, conferrals. But no matter what time were are there it is still a great night of fellowship and I always depart feeling uplifted in some way.