Try as I might, it has been extremely difficult to find the time to spend at my workbench. Whenever I thought that there would be a little bit of time to spend in the basement there would be something that would come up requiring my time and attention leaving the dust to collect for another week or two below the kitchen floor. That is just how things go sometimes when trying to juggle a variety of commitments at the same time while also dedicating time to family. However, every once in a while I am able to create the time to wipe away the dust and resume putting the pieces together.

Over the past couple of weekends, while the air conditioning was being overhauled by my brother-in-law in the basement, I was able to carve out some of that time. As the pieces were being put together and secured to the studs, I was busy at my work bench trying to find some semblance of organization and attempting to get a few of the smaller planned projects completed. While I was little help with the air conditioning and duct work, I am in my element when I have my bench, my tools, and the parts and pieces with which I am familiar.

There were many moments when we were both intensely occupied by our own tasks pulling tools, hammering pieces together, and watching each of our respective projects come together. Piece by piece, minute by minute, we each took a simple collection of parts and pieces and created something functional. It has been rather relaxing to just focus on the process and each step necessary to complete a fully functional firearm. It is somethings that I can do rather quickly but I am intentionally slowing things down and focusing on each screw, pin, and detail.  

Eventually I will resume the more involved projects but, for now, I was just enjoying the few days of working with my hands on some of the most basic tasks that I have been putting off. But, the important thing now is that I have been able to take the organization to the next level and I am now fairly comfortable with how everything is set up, what has been checked off the list, and what I have yet to start but that is stored away in boxes like adult Lego sets. I don’t know when I will be back down there, there are a lot of other things that need to be accomplished, but I can now, more than ever before, get to work right away should I find that little bit of time.

Monday, May 23, 2016

Mortgage Monday: Estimates


While I was hoping to get a head start on this process much earlier in the year, sometimes things just don’t go exactly as we plan them. Of course, there isn’t anything really pressing at the moment… there isn’t anything that absolutely needs to get done at the house. There are projects that should be started (and finished) soon like replacing the garage doors but there is nothing that needs to be done.  

Unfortunately, without things being set into motion, there is plenty of time to add things to the list. And the list is getting quite a bit longer than was previously disclosed. All of that means is that the dollar figure at the bottom of the sheet of paper keeps climbing which makes me look back and really start cutting some of the unnecessary expenses from the growing budget. This has become an even more essential task of late as we have received a few quotes.

The biggest expense on the horizon is replacing the existing heating and air conditioning systems (which also means we have to swap out our hot water supply). Currently we have an undersized air conditioning unit (I have to call the home warranty company about this) and a loud boiler in the basement providing us with both hot water and heat through the zoned baseboard system throughout the house. While functional, it is not working for us. We will be switching to a central HVAC system with a hot water heater in the basement. While most would balk as we did at the $25,000 estimate (lowest available for quality work), the simple fact is that we will recoup most of that expense in the increased efficiency.

Some of the essential repairs and alterations needed are also quoting out much higher than expected. Actually, the garage doors and motors were a little lower at $2500 while the interior French doors to my office are much higher at $2500. Some may consider these as extra expenses but, for us, they are two smaller projects that need to be done. I am not going to simply repair or replace one garage door with an uninsulated patch… it makes more sense to just replace both and take care of the motors at the same time. And the office door is needed so that I can actually utilize my office.

The last think on this list of initial quotes is the removal of dead trees. While we had much of the property taken care of a couple of weeks ago, there are still a few leafless monsters swaying in the breeze. Because of their size and location it is not going to be a cheap endeavor. The first estimate is about $2800. Some may see them as simply an eye sore but they are within striking distance of the house and it is an unnecessary risk to leave them standing. I just hope that we can find a better price.

Everything else on our long and growing wish list is pretty much on hold as we pursue these projects and try to find a way to pay for them. Once these are done we will re-prioritize the rest of the list and decide when we want to tackle additional improvements and whether we will be able to budget for them. Of course, we will also factor in what makes sense for us now and in the long run… sometimes it is best to get something done now and other times the better option is to wait. We will just have to see what happens with these first few items from our list.

Friday, April 29, 2016

Firearms Friday: Finally Getting Organized

Now that's a work bench!
It has only taken five months but I am finally getting around to organizing my work space. Within the first couple of weeks after we moved in, I did take the time to get all the boxes downstairs, unpacked a few, and stacked the rest neatly in the corner for when I had some more time to dedicate to the endeavor. With the exception of adding a few boxes and retrieving a few items, this is pretty much as far as I got with regard to organizing my work space.

The reason for this lack of progress is simple. It was quite the adjustment during the first few months in our new home and during that period of time there were other projects that took precedence over my designated basement work space. When there was some free time on the horizon a couple of months ago, once again, there were other matters that needed to be taken care of before I could spend the time needed below ground.

Now that a few things have seemingly slowed down and I am finally getting caught up on the various projects and responsibilities that have been hanging over me over the past couple of months, the time has come to set aside the time to get things organized. Of course there is also the motivation (mentioned last week) to complete a few projects and pull together a number of items to be sold. Sometimes you just have those moments when you need to cull the heard and with the unexpected expenses that my wife and I have incurred lately, a little extra cash would be welcomed.

It will also be nice to take stock of the parts that I have. While I have a spreadsheet to track much of the material huddled in the corner of the basement, I am certain that there are a few things that may have slipped through and I would like to know exactly what I have before I resume building. After all, you never know... I might be able to take a few of my personal projects up a few notches. However, the most important thing is that I will be able to have the space organized so that, in the future, I can take care of a few things when I have ten minutes here or there rather than waiting, as I have been, until I have a day to get things done. That would be nice.

Monday, February 29, 2016

Mortgage Monday: An Extra Day To Assess


Well, our next mortgage payment was delayed by an extra day as we have a bonus 24 hours this month. While usually not something to write about the warm weather lately has made this extra time particularly enjoyable especially with nearly all of the remaining snow melting in the spring like air. As the white lines have receded I have been noticing the work that has yet to be done on the property as well as the yard chores that I failed to complete before the bitterness of the winter season took hold.

Walking around the driveway I can see that the retaining wall is a little more deteriorated than I originally realized but it is still holding back the earth. Thankfully, we have some time before the rotting railroad ties are going to have to be replaced. Good thing I know a stone mason living next door. Of course, the leaves wedged against the base of the wall are not helping the situation. As soon as the weather turns toward the regularity of spring I am going to have to do some significant clearing.

That clearing doesn’t just apply to the base of the wall as the flower beds and much of the lawn still has a health covering of foliage. While we already have a rake I am going to have to pick up the lawnmower attachment and switch out the snow blower. With all these things that need to be done in the near future I kind of wish that we could put this extra day in the bank and use it for when we need it especially if we could do so to extend a weekend.

However, some of the good things that I have definitely noticed during this extra time is that even with all the snow piled by the wind against the house, the basement has remained dry. Noisy with the boiler switching on and off all day and night by dry nevertheless. With that said, there are a few spots that also need to be addressed on the subterranean level as the sealant is showing signs of age in spots and a fresh coating should be applied before the monsoons of spring.

There are always projects that will need to be done… we accepted this fact when we decided to become home owners and at least there are many items that aren’t dire and that can wait a little while for when we have the time. Heck, they are probably going to be taken care of when we have all the optional work done on the house. Now that list is one that is growing much faster than that of the mandatory fixes.

Thursday, December 10, 2015

I Didn’t Like Working From Home…


Every year, I am given ten work from home days to use as I see fit. However, even though I have been given the option to do so I have rarely used more than a couple out of necessity. I have never been a fan of working from home. This has not been a secret and there are a multitude of reasons for my dislike of this arrangement. What it really comes down to is the simple fact that I am not as productive at home as I am at the office. And that is all about the focus that I lack when there are so many distractions around the house.

However, in the few weeks that we have been in our new home, that stance is beginning to waver and, with the office arrangement that I have, I seem to be maintaining my focus better than I have been in the past. On some days it is even better than at the office. While I don’t believe it is one specific thing that has helped me I do know that it is a much more comfortable arrangement.

In the past, my office has either been upstairs or in the basement far removed from anything else in the house. Theoretically, this seems like a good arrangement but in reality it created, over time, an atmosphere that wasn’t conducive to getting work done. Over time I would use these spaces less and less until they eventually remained relatively unused and my laptop and work documents overtook the kitchen table. It proved to be quite the vicious cycle.

The only time that I had an office on the main floor was in our apartment in Bala Cynwyd. It actually worked well for a little while but because of the odd hours I kept, the close proximity to the bedroom which prevented me from typing too loud, and the maintenance issues that proceeded to drip all over the carpet, this too was a short lived arrangement. Of course, it also didn’t help that my wife and I shared the office space and we have completely different ways of working.

Now we have separate spaces on the main floor of the house. While there is still some work that needs to be done so that I can use the space on a more regular basis (i.e. doors put in so the sound doesn’t travel up the stairs at night and wake up our son), it is already proving to be an excellent place to get things done. I think I have completed more projects in this office over the past month than I did sitting in the basement in our last rental. So, now working from home might not be so bad which is a good thing because the roads might not be as friendly in our current location.

Friday, November 27, 2015

Firearms Friday: More Space

A similarly blank canvas...
When my wife and I first saw what would become our home, we pretty much knew what we were going to do with each of the spaces and rooms. Actually, we found a house with enough room that we had to put some effort into figuring out what each of the rooms would be after we filled the spaces that we knew we needed (this is how our son ended up with two playrooms). Two of the spaces that we were able to immediately figure out were my office (the former formal living room) and my work bench and safe space (the dry and clean unfinished basement).

Let’s just say that I have a very understanding wife. In our former rental I had taken over the basement with a combination office and work area. Now I have more room than I really know what to do with as the basement covers the entire footprint of the house with nothing else down there except the basic equipment (i.e. boiler, well filters, electrical panel, etc). There was already a small work bench tucked in the corner and now that small section is significantly expanded. I might be taking up an eighth of the space and that is pretty spread out.

For the first time I am going to be able to keep the vices, cleaning kits, and tools out and organized. This is a bit of an odd situation for me as I have always needed to put things away at the end of the day with the previous work spaces that I have had. In addition to being more convenient and feeling like it is a more permanent space, it is also much more efficient. With all those items already out and ready to be used, I am able to immediately start working on a project seconds after I open the safe.

Being able to separate my office from my work space is something that I have been looking forward to for some time now. Work is work. It is a completely different atmosphere and mentality. Relaxing at the bench is just that… it is a means to forget things for a little bit and focus on the small projects and working with my hands. Now that we have the space, and the fact that I have an understanding wife, I am able to have those two areas to myself. Hopefully this means that you will be reading about some long overdue updates to a variety of projects that I have mentioned before… at least after I get everything organized.

Wednesday, October 14, 2015

Overdue Project


Of all the projects that have been talked about at the lodge time and again there is one that piques my interest each time that it is brought to the forefront of the conversation. The discussions have been ongoing about reallocating different spaces in the lodge to fill our various needs one of which is moving the Secretary’s office to the main floor. I fully support this idea but I also do my best to stay out of the back and forth unless someone asks for my opinion. After all, it is just a room, I can do the work no matter where there is a place set aside in the lodge whether it remains in the back of the basement or it is right off the main hall on the ground floor. The change would be nice but it doesn’t really matter.  

Not long after being raised I began spending a fair amount of time in the basement assisting the previous Secretary with the various tasks that fill the weeks between gatherings and the nights after the meetings. For all of its flaws, it has always been a bit of an escape for me. However, when I assumed the office shortly after that, it was painfully clear just how much work needed to be done in the space to simply make it functional again. And in my first year as Secretary, the situation didn’t get any better when a leak was discovered streaming down the outside wall. Needless to say, the “organization” project never got back on track after that and I rarely venture below grade these days.

That is a projects that is long overdue… finding some sanity in the office and turning this old fallout shelter (designated by the town years ago) into a fully functional working space not just for me but for any of the brothers who need a place to privately meet at the lodge. What it really comes down to is setting aside the time, convincing a few brothers to do the same, coordinating with the Trustees to sort the material crammed within the walls, and cleaning out the entire room. It actually might be best to just hit the reset button and start from scratch.

We need to consolidate the furniture and figure out what is really needed in the space. Part of that will be consolidating the filing cabinets after sorting through the draws full of files with the Trustees overseeing this operation. And finally, it is about simply getting rid of all the trash and clutter that has accumulated over the years from old phone books and computers to empty boxes and brittle desk organizers. It seems like a quick and easy endeavor but I know that it’s not. This is going to take some time and some significant effort but I do have a plan together to finally get it done next year. Let’s just hope that it sticks on the calendar.

Friday, January 2, 2015

Firearms Friday: We All Need A Good Work Bench


For the last few years, while my wife were living in an apartment packed from end to end, top to bottom, I had to have my desk serve double duty as my work bench as well. It was always a process and a project just to get things started as everything needed to be cleaned off from the usual work day so that I could pull out the work mat and attach the vice to the side. Once that was all done, it didn’t really leave much time to get things done. Of course, having the office next to the bedroom didn’t allow for any work getting done beyond cleaning at night either.

Now, in our spacious new place, for the first time I am able to set up a dedicated work bench (from Home Depot) in the basement, two floors away from the bedrooms. In a different part of the space I have my desk set up solely dedicated to writing, filing, emailing, and other work on the computer. Finally, each of my passions have areas designated for each. While I will maintain an organized space, there is no more clearing off and hiding away electronics, papers, tools, parts, and cleaning supplies. Everything can be left out, set in their designated spaces.

Just having each of these areas divided in the basement, I feel as though I have more time to do what I enjoy and the small projects that I want to get done are accomplished much faster leaving me with more time to spend with my wife. Everything is easily accessible. Still locked away but a simple matter of security that is still much faster than the previously lengthy process of shifting purposes for a single work space.

This new workbench will also impact my work as it will allow me to bring new content to this blog. Reviews of firearms, equipment, and parts can now be achieved now that I have a work area dedicated to those projects. I can also now take on minor cleaning, repairing, and upgrading projects that will not only provide additional content but will allow me to better educate myself on different processes and systems. So look for some different content every Firearms Friday as I continue to organize and get my work bench outfitted to fit my needs. It should be fun and provide a much needed respite both now and in the future!

Wednesday, November 5, 2014

And The List Gets Longer…


With a variety of projects and tasks that are currently being worked on, I did my best to get to the lodge a little earlier than usual last night. Not an easy task with so much going on at the office at the same time. After cursing at a few “drivers” on my way to Ardmore and making a couple of calls along the way, I was finally able to make my way to the old building only a little bit later than expected and I wasn’t surprised to find that I was the third one there.

The leak in my basement office seems to have been fixed but the lovely aroma leaves a lot to be desired and the subsequent shifting of items around has set the organization thereof back at least a few weeks. I guess now is as good a time as any to sift through a few items before simply putting them back. But that is another project for another day.

I met with a couple of brothers to see about finding space for a new business venture. This is one that I am especially interested in making happen as it wouldn’t just bring new people into the lodge but there are a number of brothers (including myself) that would welcome the opportunity to participate. Other conversations later in the evening also revolved around the simple (not really) questions of what it is that we really do for a living. It’s funny, but if you take the time to ask the question, you might be surprised by how much your occupations overlap.

Those were just the ancillary items that we had to take care of. With a stated meeting only a couple days away and just over a month until our Red Cross Blood Drive (Saturday, December 6th for those in the area that are interested), there are still a lot of things that we need to prepare. It seems that most weeks, especially lately, I need at least an extra day or two just to keep things current. Thankfully, there are a lot of items ready to go and things should continue running smoothly through this week and the end of the year.

After our general meetings, unfortunately bills did not make up one of them, we all came together from the various corners of the lodge to both review what had been discussed and congratulate one of our brothers on his exemplification (that was happening concurrently with all the other tasks). Assignments were handed out and we all went our separate ways to reconvene tomorrow night when I hope to see both my brothers and a crowd of veterans honoring us with their presence. All in all, I guess you could say that it was just another Tuesday night at the lodge.

Wednesday, October 29, 2014

Not A Good Sound To Hear At Lodge


I arrived at the lodge last night a little earlier than usual as there were a number of things that needed to be done and everyone has places that they needed to go later in the evening. It was a relatively quick meeting with everything taken care of, or so we thought, and we soon found ourselves discussing some of the event that we have going on over the next few months and those that we need to work on for next year. In the end, there was more progress made with regard to scheduling than any of us had anticipated. Great, fewer details that we have to take care of later.

With other brothers arriving the conversations quickly became varied and we found ourselves jumping from topic to topic just enjoying the fellowship of the night. With only a couple minor tasks that still had to be addressed I adjourned to my office in the basement, pulled out the books, and finished up my weekly tasks. That is when I heard the sound that I have become all too familiar with over the last couple of years.

The dripping was constant and could be heard prominently in the small space once the rustle of papers calmed. I first looked at the ceiling to see if I could see any stains but didn’t find any discoloration. My attention then shifted to the windows where I again found nothing. But, out of the corner of my eye I caught a glimpse of the buckling wainscoting right next to the window. It didn’t take much more than a gentle breath to cause the particleboard to fail and crumble onto my desk. And right above it was the steady drip that was echoing throughout the small basement space.

As I have said before, there are some things that I am able to fix, either temporarily or permanently, but plumbing is not one of them. Thankfully I could hear a couple of the brothers talking in the entryway who have professional experience with such issues and so I ran across the basement and up the stairs before they could walk out the door. After an extensive minor investigation, we couldn’t find much let alone the primary cause of the slow flow but we managed to move everything out of the way, unplug the electronics immediately in front of the water feature, and made the calls to get it taken care of in the morning.

While I could have been out the door moments after those few tasks were finished in the office, the leak took up a little more time than I was expecting and I found myself shutting off the lights and locking the door with enough time to get home by 10:15pm. While usually not for situations like the one last night, this is why my wife and I don’t expect me home early on Tuesday evenings. So far, that is the only plan that seems to be working on lodge nights as everything else remains fluid.

Wednesday, January 15, 2014

Tour Guide


In addition to the usual lodge work that was conducted last night, I also had the opportunity to do something that I had never done before… give a tour of the lodge. I had received an email just over a week ago from a man inquiring about the lodge and freemasonry in general. As soon as I was able to set aside a few minutes later in the day, I sent him a reply with an application as well as a very general overview of the process. Of course, I welcomed him to give me a call any time so that I may answer any questions that he might have in a more efficient and personable manner.

A week passed and I had not heard back. Sometimes men change their mind, sometimes they get busy and time gets away. Fortunately, in this instance it was the latter. Upon circling back a week after my first email, he responded saying that he would call over the weekend. While I do my best to avoid work calls on weekends, lodge calls are different. This past Sunday we spoke briefly over the phone. I answered a few questions that he had and invited him to stop by last night since I would be there for a little while in the evening to get some things done.

I left work a little earlier than I usually do, around quarter to six, and managed to get to the lodge just after 6:30, nearly the exact time that I said I would meet him. I opened up the door, turned on the lights, and began the ‘tour’ by introducing him to a couple of the brothers whom I would be working afterward. Beginning at the top we started with the lodge room. While there weren’t many questions asked, I tried to go over and anticipate some of the basics throughout.

We came back down the stairs, through the entryway, and into the main auditorium. While the details of the building need a bit of touching up, the space itself is impressive and his reaction reminded me of my first experience of being shown around the lodge in the deep heat of summer in 2012. However, while the first tour of the lodge is impressive, as many of you know, it’s usually the second time through the doors that is life changing.

Because the space in the basement is currently being used, we skipped that part of the building but sometimes I think about how men reacted to touring the building when all levels were utilized by the lodge and the pool tables and bowling alleys in the basement were used on a regular basis. Anyway, we finished up by chatting a bit near the front door and before long, the prospective brother was on his way out the door to meet his wife for dinner. Meanwhile, the rest of us resumed our usual Tuesday night routine and began pushing through what needed to be taken care of that night.
 

These are the bowling alleys in the basement of my lodge.

Saturday, December 28, 2013

Where Has The Time Gone?

Every year my parents have a holiday party at their house. There are a few relatives that the only time that I see them during the year is at this party so it is a nice opportunity to try and catch up. In previous years there have been dozens of family and friends present filling all the rooms on the first floor and making it a challenge to walk across the house. While a smaller gathering this year due to illness and other life events, it was a great time to sit, talk, catch up, and eat.

Like every year, the kids took over the basement and provided some entertainment throughout the evening as we all participated in the usual game of dodge door. Every twenty minutes or so we could hear the low rumble of little feet stomping up the carpeted stairs. A few seconds later the knob would jiggle and turn and the door would come flying open. For the most part, everyone knows that you either don’t stand there or you keep your ears open to the stampede.

I was once one of those kids running up the stairs but as is clear when thinking about years past, things have changed and we have all gotten older. Many family members are no longer with us but this party proves to be the perfect time to think back to the happy, and sometimes funny, moments that we were able to enjoy with them. Even just seeing a large group of people in a room and recalling the lineup on the couch holding court in the family room. Sometimes it is as simple as recalling an image.

By the end of the evening, the cooler was much lighter, the tables were a little thinner, and the desert table looked like a bomb went off leaving cake bits and cookie crumbs strewn about. While some were still standing and a few of us sitting wherever we felt like no longer standing, all of us were quite full and not really wanting to move too much (although there were a few people making some determined trips to the dessert table). This is the time of evening when everyone realizes that it might be best if they start heading out the door and make their way home.

It is also a constant surprise as to how quickly time goes by at these parties. You sit down and start talking and before you know it half the people have left and it’s time to go home. This is always an interesting shuffle at the end of the evening as no matter how good you think your plan is when you arrive, it is inevitable that you are going to have to wait for someone to move their car before you will be able to leave. A good time was had by all and I am already looking forward to next year.