Showing posts with label air conditioning. Show all posts
Showing posts with label air conditioning. Show all posts

Monday, September 12, 2016

Mortgage Monday: Time To Keep It Simple


With all of the work being done on the house lately things have been rather complicated. So far, nothing has been as simple as it should be. Everything on our project list has had a few subsections added to it with the floors and the exterior doors being prime examples of this ongoing process. However, in the end, many of these things, all of these complications, are going to give us what we have been picturing in our minds as our ideal home. Further, many of the things that have been uncovered and a couple of the future projects have and will remove some of the complicated aspects of our home.

The best examples of this are the HVAC overhaul currently underway and the electrical overhaul that we have on the schedule. The old oil and electric system required a heck of a lot of copper pipe running across the basement and up the walls to supply the baseboard heating. The air conditioning, being an afterthought of the original homeowners, was something that was put in as inexpensively as possible leaving us with duct work running through bedroom closets and really not being very efficient. The boiler, oil tank, and all of the copper pipes are now gone, the duct work has been overhauled, and we have now simplified the two zone (the heating was originally on four zones) system running forced air for both heating and cooling.

This project is nearing completion but the electrical work has yet to be started. While a few steps have been taken to simplify this (i.e. old whole house fan has been removed) there is still a lot of work to be done with new matching fixtures being installed and a lot, and I mean a lot, of outlets and switches that are going to be removed (with a few simply being moved). This will eliminate the need for a lot of the wiring that is running throughout the house and will put things (or leave things) in place that actually make sense (i.e. I don’t need three separate switches for the kitchen lights).

It is definitely a process but, as I said before, it will simplify some of the basic aspects of our house. After all, I don’t like having excess pipes and wires running through the walls when they don’t need to be there. After that it should be much easier to maintain. So, we will have to deal with a little more complication before we can reach a point of simplicity. Well, at least until the next round of renovations and projects.

Friday, August 26, 2016

Firearms Friday: Returning To The Work Bench


Try as I might, it has been extremely difficult to find the time to spend at my workbench. Whenever I thought that there would be a little bit of time to spend in the basement there would be something that would come up requiring my time and attention leaving the dust to collect for another week or two below the kitchen floor. That is just how things go sometimes when trying to juggle a variety of commitments at the same time while also dedicating time to family. However, every once in a while I am able to create the time to wipe away the dust and resume putting the pieces together.

Over the past couple of weekends, while the air conditioning was being overhauled by my brother-in-law in the basement, I was able to carve out some of that time. As the pieces were being put together and secured to the studs, I was busy at my work bench trying to find some semblance of organization and attempting to get a few of the smaller planned projects completed. While I was little help with the air conditioning and duct work, I am in my element when I have my bench, my tools, and the parts and pieces with which I am familiar.

There were many moments when we were both intensely occupied by our own tasks pulling tools, hammering pieces together, and watching each of our respective projects come together. Piece by piece, minute by minute, we each took a simple collection of parts and pieces and created something functional. It has been rather relaxing to just focus on the process and each step necessary to complete a fully functional firearm. It is somethings that I can do rather quickly but I am intentionally slowing things down and focusing on each screw, pin, and detail.  

Eventually I will resume the more involved projects but, for now, I was just enjoying the few days of working with my hands on some of the most basic tasks that I have been putting off. But, the important thing now is that I have been able to take the organization to the next level and I am now fairly comfortable with how everything is set up, what has been checked off the list, and what I have yet to start but that is stored away in boxes like adult Lego sets. I don’t know when I will be back down there, there are a lot of other things that need to be accomplished, but I can now, more than ever before, get to work right away should I find that little bit of time.

Tuesday, August 23, 2016

TMI Tuesday: I Don’t Like Working Being Done!

Might have to make one of these given how fascinated he is with the work being done.

Over the last couple of months we have had something going on at the house. From the big projects like the doors, floors, and garage to basic maintenance and inspections to our current air conditioning marathon, there has been a regular flow of people in and out the door. While our son does enjoy watching the work being done and seeing new people every now and again, there are definitely moments when he has simply had enough. And he has no qualms about letting us know when he is done with all the work.

Thankfully, now that the floors are done on the first floor, we are past what we consider the most inconvenient and intrusive part of the renovation process. However, we currently find ourselves in a position where we are having the air conditioning being overhauled on the weekends and while it doesn’t really impact the living area upstairs, it does take me away from my son for a little bit during those precious days away from the office. It really is a give and take at this point but these are things that will pay huge dividends in a myriad of ways in the future.

He does enjoy the opportunity to spend time with family and playing with his cousins. They have been able to keep his mind off of the banging and drilling for the most part and have, in general, kept him occupied during what could be a difficult time of the week. That doesn’t change the fact that he really doesn’t like work being done at the house and there are moments when he stops and clearly babbles his displeasure at the situation.

It makes us wonder how he is going to react to the additional projects that we have planned for the future and whether or not there is enough of a break scheduled in between the phases. Of course, that window could be much smaller should a few things get delayed further but I am trying not to think about that… our luck has to change in that regard, right? I am certain that there will be some sort of voiced frustration but I am not sure to what degree. We will, like many other things, have to wait and see how things play out.

However, with all that being said, our son does seem to like the changes and gives us this look every now and again like “now I see what you were doing, this was definitely worth it”. And it does help that he is able to sleep through a lot of noise and overall commotion. So it may prove to be beneficial when we finally return to what could be considered a “normal” routine. Whenever that is.

Monday, July 25, 2016

Mortgage Monday: And Then That Happened…


Last week, in the early afternoon, I was in the middle of a project at the office. The deadline wasn’t until the end of the day and I was looking forward to taking care of a few other things before leaving the office that evening. After my phone had vibrated for the fourth or fifth time I found a good paragraph after which I could take a quick break and read the messages. I knew that they had to be from my wife but I had no idea what she was writing to me about.

Well, it could have been worse but it also could have been so much better. It turns out that the air conditioning, a project still lingering in the middle of our to-do list, decided to stop working in the middle of the day. And, of course, it was one of the hottest days of the year. That short break from the project I was working on was no longer a short break as I had to make half a dozen phone calls before a “solution could be found”.

Between the calls with my wife to get some additional details, texting my brother in law (this is what he does for a living), calling and emailing the home warranty company (the AC is covered under our policy), and finally trying to get a hold of the referred service company, all that time that I once had quickly went up in steam. Thankfully, I had gotten enough written before the chaos and I was able to get the project completed by the time I left the office (which was a little earlier than usual so I could meet the repair person when he arrived at the house). Driving home, I was expecting the worst as the half sized unit had been struggling lately.

I arrived at the house just as the service window was opening. Not surprising was the fact that it was another two hours before the technician pulled into the driveway. Almost immediately he began making comments on the small AC unit tucked away behind the garage. What did provide us with a rather pleasant surprise was the fact that it was a relatively simple solution to our problem with a loose wire (likely due to the constant usage) being the culprit. Thankfully, the air conditioning was restored quickly allowing for the house to cool a little before we put our son to bed.

Of course, this little hiccup has really put our renovation list in focus as the overhaul needs to be completed in the near future as I doubt that the next stoppage will be remedied so easily. We really are just waiting for the next time at this point and hoping that it holds off just a little longer until we can budget for the replacement system. But, for now, we are just going to enjoy the cool air for as long as it lasts.

Monday, January 11, 2016

Mortgage Monday: The Other Monthly Checks


In addition to writing a check to the bank each month to slowly pay down our mortgage, there are also a variety of other checks that have to be taken care of on a monthly basis. Again, this is not something that I am used to doing but a monthly project that brings a sense of satisfaction as this is a home we now own. And while there are checks of the monetary kind that I regularly write, these are not the ones to which I am referring…

We want to make sure that we keep up on the maintenance of our home while also heading off any issues that may exist. This is why I tend to go around the house every once in a while, usually a few times per month, looking for little things (and big things too). Are the windows drafty? Are there any water stains? Is the heat working in all four zones? Are the gutters clear? Are any of the fixtures leaking? These are the kinds of questions that I try to ask myself as I walk about the house looking in corners and keeping an ear open to any sounds of water, pinging, clanking, etc.

While I don’t expect to find anything it is well worth the time to invest in these basic checks as we are still under warranty (part of our original deal during purchase) and any issues that come up would most likely be covered under that policy. Basically, it is all about making sure everything is running the way it should be. After all, this is no longer simply a place in which we are living as in the past, this is our home and we want to make sure that everything continues to be kept in great shape.

And, as the seasons and weather changes, I will be sure to check the same things as well as different systems around the house. The various filters are something that will be checked regularly but, as the weather warms, the air conditioning will also have to be looked at. We didn’t have any issues with inspections, only minor things here and there that were taken care of before we moved in, but we want to make sure that things are operational and that they are the right systems to have in place.

Maybe we will upgrade or change the air conditioning, heat, windows, flooring, etc. We will have to wait and see and continue to go through our check list every month. Then we will know what needs to be replaced (if anything), what we want to replace, and what we might consider doing in the future. So far everything is great but you never know… this is why I have to take care of so many checks each month.

Saturday, September 5, 2015

Returning To Action


I always feel unprepared when returning to the lodge after being off from labor the entire summer. I find myself trying to look back to made sure that I am not missing anything from the past meeting in June that will carry over to the current month. It is also when I know I am going to get questions about the activity during the summer and what the plans are to close out the year. My mind is kind of all over the place when I walk through the doors in September.

While I shouldn’t be surprised, the meeting went as smoothly this month as I could have ever hoped for. Well, almost. It would have been nice of the weather had cooled down a bit and to have more brothers in attendance so that we are not playing catch up before the next meeting but I can’t really complain (too much). However, because of the heat and the absences, my night did end up being a lot shorter than I was expecting.

With the summer holding on to the calendar for a bit longer, the heat of the day carried over into the night and turned the lodge room into a sweat box… this was especially true for those of us who are in a tux during the meeting. Essentially, we were able to have a meeting, reconnect with each other, and lose a few pounds by the time we adjourned to the hall to finish up our program. This is the first time that I can recall (in my very short masonic career) finishing the meeting downstairs and it certainly was a welcomed change by everyone in attendance.

It is while we were in the air conditioning that we were all able to get a better understanding of most of the appendant bodies within freemasonry. Most of us are members of some body beyond the blue lodge but we are all still a little in the dark regarding some of the other bodies (there are exceptions to this as well). The most interesting part of this educational evening for me was learning about each of these bodies directly from the respective officers. There really are a lot of opportunities and different experiences within freemasonry that I hope to enjoy at some point in the future.

The biggest take away for many of us is very simple. While there are numerous appendant bodies and opportunities to join across the wide spectrum of freemasonry, they all trace back to the blue lodge, our home lodge, this small group of committed brothers that work each and every day to help the fraternity in some small way. We all have this same foundation and we each decide what kind of structure we build upon these three degrees. I am looking forward to seeing these buildings progress each meeting and every year.

Tuesday, August 4, 2015

TMI Tuesday: Power Outage


As I was getting ready for bed last night I could hear the wind screaming against the windows and doings it’s best Jethro Tull impression with our chimney. I guess we were on the wrong end of the thirty percent chance of rain. The wind continued with relentless gusts as my wife and I recounted the day and not long after we both shut our eyes the room went completely dark. With echoes of thunder and strobes of lightening filling every corner of the house, we knew that this was going to be one storm that our son was not going to be able to sleep through. Just as we finished vocalizing that thought our son proved us right.

He was already having some issues staying asleep lately and this meteorological front was the final piece in ensuring that he completely woke up from his peaceful slumber. We could hear him rustling in his crib between the rumbles and as the rain pelted the roof and the waterfall filled the windowsill, he became more and more vocal. As soon as the crying overpowered nature, we knew it was time to comfort him so we got up, rummaged in the nightstand for a flashlight, and prepared for the long night.

As soon as we walked into the room and began trying to sooth him he calmed down and went back to sleep (well, maybe the second time). What ended up getting him was the fact that the electric decided to start stimming, turning on for a second or two every five or ten minutes for about an hour… just enough to wake him up. The other thing that wasn’t helping was the fact that our son was beginning to overheat. He is a little space heater and needs to be kept cool so he was stripped down to a single layer for the night.

Surprisingly, PECO was actually pretty close to their estimate from earlier in the evening as power was restored two hours later. At that point we could all rest a little better and home that we would be able to recover relatively quickly in the morning. It was already going to be a long day for us and now we just added lack of sleep to the mix. It looks like it is going to be a late morning and early night for all of us… it was actually the first morning that I can remember our son not greeting me with a wide smile. Instead, I got a nearly silent snore.

Wednesday, June 25, 2014

A Few Degrees Before Going Dark

 
Extra meetings can become somewhat routine if you let them and in June that feeling is what keeps many brothers from turning out to lodge to witness or participate in degree conferrals. While this isn’t an issue for me (I rather enjoy being a part of a brother’s Masonic journey) I have heard of this and seen this be the case with some of the brothers that I have spoken with or seen at these fraternal milestones… I saw plenty of heavy eyes during my own degree conferral (of course it was a one day class that took up much of the day). There are times however when things are changed up and something a little different is introduced into the evening.

Last night I had the pleasure to watch the Shield & Square Degree Team confer a degree on a new brother. This dedicated group of current and retired law enforcement brothers really know their stuff and the entire degree was not only spot on but you could tell that they really put a lot of work into making the night come alive. It was especially gratifying to witness this degree as the brother who was at the center of the evening first reached out to me shortly after I took office. I have literally been a part of the process from beginning to the times that the DDGM handed him his dues card and I am incredibly proud of that fact. I know he is going to be (actually he has already proven to be) an excellent and dedicated brother.

If that wasn’t enough, we also conferred two more degrees last night. While the late hour and steamy weather (again, no air conditioning in the lodge room) made the evening seem that much longer, it was a night that seemed to end before it really got going. Actually, I don’t know if it was the night or if it was the fact that this was the final meeting before going dark for the next two months but just as I feel I am finally finding my stride it is time to take a break.

Even though there are times when I am constantly running around before heading up stairs, I am going to really miss those meeting nights at the lodge. Don’t get me wrong, there is plenty of work that I will be doing but the fellowship is what this job is really about. Thankfully, there are plenty of Masonic events that I will be attending and writing about over the summer and the fall looks to be particularly busy. It is for this reason that I can’t wait for the weather to cool down.